- Jul 11, 2012
- 889
- Boat Info
- 2000 ~ 510 Sundancer
2024 ~ Highfield 360 Sport
Twin Axiom 12" MFD's
AIS 700
- Engines
- Twin Cat 3196's
Just got my winter to do list caught up. It has been a very productive 4th quarter, I can sit back and relax a little bit now. LOL
2023/24 winter To-Do list
- Fresh water manifold repair/replace. It stopped leaking ???
- New salon carpet. In progress
- Repair/replace fuel sending units. Done
- Install new Lumitec lights in salon. Done
- Ice maker repair (again)
- Compound & polish. In progress (85% completed)
- Gel repairs. In progress
- Sea deck after platform is done Spring install
- Cockpit upholstery. Done
- Install USB plugs at helm sea.t Done
- Clean bilge. Done
- Remove HD antenna Done
- Re-paint speaker rings
- Generator valve adjust: Shane at All Star Marine. Thursday 1/18
- Drawer slide extensions. Done on all drwaers
- Light switches add USB. Done in 3 locations
- Add 120v receptacle at galley. Done
- Rope lighting replacement; galley and stateroom. Done
- Tighten horn bolt at port side horn mount, leaking. Done
- Powder coat chocks and chock tracks at platform. Done
- Replace lock cylinders on GHS lift. Done
- Check fluid level in lift reservoir. Done
- Yacht Solutions electrical check up for Ground fault issue.
- Replace master head pump motor and bellows On order. Completed 12/28
- Install AIS700. Done
- Hot water heater replacement. Done
- Install larger accumulator tank .Done
- Repair Captains seat gas spring. In progress
- Remove and repair under stern cleats where cracked/chipped. In progress
- New floor tiles under stbd. rear seat. Remove old, clean, install new. Done
- Wet sand stbd. side below rub rail from stern to bow. In progress 1/15. Spraying gel 1/16
- Fill snap holes on port/stbd. side below windshield. In progress 1/15. Spraying Gel 1/16
- F-11 entire boat. In progress
- Cockpit carpet to cleaners. Decided to re-template cockpit and order new Aqua weave from Corinthian Marine. Templates arrived at Corinthian 1/15.
- Install new seal on port side dripless.
- Tighten rudder nuts and check packing.
- Check battery levels in January and May.
- Repair LED lighting behind helm switch panel. In progress
- Polish isinglass before launch.
- Tighten last bolt on windlass. Shane @ All Star Marine. To be done 1/18.
- Polish stainless rail around entire deck.
- Final wash and clean up before launch with DI water system.