Finally got to the last two stainless thru hulls for the air conditioning units. Took the cabinet drawers out in the stateroom and could see it but couldn’t get to it. Had to take out the whole cabinet. And there she was. And dassit
Such a small amount of carpet it’s not that expensive. Just the floor was around 600 recently. Plus install. Another 600. The first time was a bear stripping the old stuff off with the factory glue. The second time was easier. Hatches needed to be trimmed. Those wood floors are beautiful, but...
I changed out both the sidewall and flooring. I had a carpet guy that did my homes. This is the second time. I doesn’t last too long I got maybe 6-7 years out of it. I don’t like the runners. Wood scratches. Carpet feels and looks warmer to me.
Screws from inside the flip down cubby that stores the hose for the central vac. You’ll have to call for pricing. Not cheap. But an amazing upgrade. I sold my table to a guy who had steps done on his 340. They looked amazing and I had to have a set. I bought a table from him too. Got it last...
One of my winter upgrades is replacing the cabin steps with teak. Shout out to global shipwrights, a forum sponsor, keeping me informed on the progress. I was the first to template the stairs. Fascinating to see the cad design and how they are made.
How did you get it there.? I’m sending globaldhipwrights.com the pattern so they will have it. I cut out the pattern, just need to go back and check fit. Capt Rich is a very nice guy. He offered a lot of advice.
Thanks!
winter projects :
Waiting on the arrival of my new salon table from global shipwrights
Sending them a pattern of the cabin steps, replacing with teak
Isotherm cruise 85 where the ice maker went Gotta figure out how to get the DC back to the panel. May just go straight down to the...